Our experience team completed internal concrete work for the factory. External concrete works for car park and yard.
The Project
Client
Courier Connections
Location
Eurocentral, Scotland
Project Size
£250k
What we did
We helped Courier Connections move from their old location in Bellshill to new large purpose built warehouse and depot in the distribution industrial estate Eurocentral. Being Situated just off the M8 motorway it has easy access to both Glasgow and Edinburgh.
On the external works for the car park and yard we completed concrete surfacing, concrete services and drainage works. We reduced level excavations, formation of external yard and car park areas. Type 1 base and compaction was also completed ready for us to construct and install shuttering (formwork). The whole are had reinforcement mesh with poured concrete but a brush finish.
Internal concrete works were completed as above but with power float finish. All excavation works for installation of duct for services and pipework for drainage including all connections.
Project in numbers
216m2 Concrete required for internal floor slab
380m2 Concrete external lorry yard
10m2 Concrete forming entrance
20km Drainage works